Mission Statement

If we cannot mine safely, we will not mine. We responsibly manage our impact
on the environment and host communities. We act with honesty, fairness and
transparency. We treat all stakeholders with trust, dignity and respect.

About Us

Arcadia Mine located in Goromonzi with a project area extending over 14km², is considered to be one of the world’s biggest hard rock lithium resources. The Arcadia project is located 38km east of Harare and lies in the high veld near the Arcturus gold mine. The deposit is made up of Winston, Takashi, Green Mamba, Bing, Tourit, and the Oribi Li-Be claims, which were operated before the early 1970s.

If we cannot mine safely, we will not mine !

Our Pits are located in Goromonzi Zimbabwe and we are a leading black, white and grey Lithium producer in Africa.

The lithology of the Arcadia lithium project includes greenstone rock units of the Arcturus formation, a part of the Harare Greenstone Belt (HGB). The greenstone belt is a complex refolded synformal structure, cropping out as two major limbs, including an east-west trending Arcturus Limb and a north-south trending Passaford Limb.


The lithological units found at the belt include meta-basalts, banded iron formations, meta-andesites, serpentinites, dolerites, and lithium-bearing pegmatites.


The deposit is hosted within a series of stacked, subparallel petalite-spodumene-bearing pegmatites, intruding the HGB. The drilling results identified pegmatites with an average thickness of 15m and extending up to 3.5km along the strike.

Mission Statement

If we cannot mine safely, we will not mine. We responsibly manage our impact on the environment and host communities. We act with honesty, fairness and transparency. We treat all stakeholders with trust, dignity and respect.

Our Vision

To be a recognized Lithium mining company focused on growing sustainable production, delivering on our commitments for excellence and valuing and developing our employees.

The Arcadia deposit will be mined as a conventional truck and shovel open pit operation via contract mining. Mining operations are planned to be carried out in two pits comprising a main pit and a satellite pit located northeast of the main pit.


As part of the first phase of operations, the main pit will be mined in four phases, which include two smaller starter pits within the main pit.


Mining operations are expected to be carried out using track-mounted diesel hydraulic backhoe excavators to load ore and waste into dump trucks. Ore gradings of 1% Li₂O or more will be transported to the run-of-mine (ROM) pad and stockpiled for reclamation by a front-end loader. The lower-grade ore will be stockpiled and used as a blender with high-grade ore.


The run-of-mine (ROM) ore will undergo two-stage crushing followed by a high-pressure grinding roll (HPGR) to achieve the desired 5mm crushed product.

 

aboutimage

Products

We are specialists in production of Lithium, Gold and quartz blocks in all sizes and categories for local use and export.

Lithium

Lithium is used in buildings, bridges, paving, monuments, and many other exterior projects. Indoors, polished Lithium slabs and tiles are used in countertops, tile floors, stair treads and many other design elements. Lithium is a prestige material, used in projects to produce elegance and quality.

Gold

Gold is used in both internal and external applications. Further Gold has a translucent feature and it allows light to enter and give out a soft glow. Gold can also take a very high polish. Thus it is also used in making sculptures and other various rock or stone applications.

Quartz

Quartz is an important mineral with numerous uses. Sand, which is composed of tiny Quartz pebbles, is the primary ingredient for the manufacture of glass. Transparent Rock Crystal has many electronic uses; it is used as oscillators in radios, watches, and pressure gauges, and in the study of optics.

Our Executive Team

Dr Victor Robertson

Chairman / Director

 

Victor Robertson is currently Chief Operating Officer for Arcadia Mining Projects. Previous to this appointment he was responsible for the Group’s capital projects portfolio and joint-venture operations and was other mines’ Consulting Mining Engineers. Victor has been with us for ten years. He is a registered professional mining engineer with over 40 years’ experience in hard rock mining including extensive experience in gold, platinum and base metal mining where he has been involved in exploration, feasibility studies, design, construction and management of numerous projects. Some of the mines successfully commissioned under his leadership include Makuti Gold, Munyathi Mine, Madziwa Nickle, and Zimplants Chegutu. He is a past-president of the Association of Mine Managers and has served on a number of boards during his career. He has also served as Managing Director: African Operations at Bindura Nickel.

Jeffrey Hlatswayo

Operations Director

 

Jeffrey Hlatswayo contributes to Arcada Mining Projects for more than 10 years of operational and project experience in the mining industry across numerous commodities and geographies, particularly in Southern & Central Africa. Jeffrey served as General manager of Ashanti Gold between 2011 and 2017, responsible for the group’s copper, zinc, silver, lead and gold operations, and sales and marketing. In this role, he also led the planning and development of the Bindura Nickel mine in Mashonaland Central. Prior to joining us in 2017 as Operations Director, Jeffrey was the Executive General Manager for Bindura Nickel Mine and served as a non-executive director on the board of Ashanti Gold Mine.

Joshua A Ndlovu

Procurement Manager

 

Mr J A Ndlovu has more than 18 years’ experience in the Mining Industry having joined ZIMASCO in 2002. He joined ZIMASCO as a General Manager after completing his training with Ashant Gold - Freda Rebecca in Bindura. In 2005 he was appointed Commercial Executive for Ashanti gold mine, and his role was combined with that of Company Secretary. He was subsequently appointed General Manager Administration in 2007, a position he held until his appointment to the position of Procurement Manager in 2013. Amos is an active board member of some of Zimbabwe’s leading companies.

Tanaka Lunga

Product Manager

 

Tanaka Lunga has more than 20 years’ experience in the mining industry having joined Wankie Colliery in 2000. He worked for several organisations before joining Mimosa in 2008 as a Product Controller. He rose through the ranks and held various positions namely Plant Product Assistant Manager, Senior Manager - Growths Projects and Head - Growths Projects before being appointed Product Manager in 2020. He sits on the boards of relevant Institutions of Higher Learning in Zimbabwe.

Employees

Arcadia Mine is one of the largest private sector employers in the region, with over 90% of its employees being drawn from the local community. Arcadia Mine is committed to building skills and capabilities in the region, and has become a hub for local technical training.

© 2024 Arcadia Mine. All rights reserved | Design by Arcadia Mine ZW